HYDRO ENERGY DIVISION


This page has hierarchy - Parent page: TECHNOLOGIES

The Company Ercole Marelli Hydro Energy Division performs its activity of supply and construction in an equipped area near our Productive Units of Sergno with useful height of span up to 15 Mt. and enslaved by suitable lifting with course profit from 15 to 60 Tons.

The production and activity of the Company Ercole Marelli Hydro Energy Divisionare to be placed in the following areas of industrial production:

Supply and Assembling of Hydro Generators used in the industry for the Production of Energy type:

  • Hydro Generators  Vertical …… Power Range 2,5 MVA ÷100 MVA
  • Hydro Generators  Horizontal … Power Range 2,0 MVA ÷100 MVA

Supply and Production of spare parts:

  • Hydro Generators  Vertical
  • Hydro Generators  Horizontal

The Company Ercole Marelli Hydro Energy Division performs its Quality Test (mechanical / electric) during fabrication and final condition.

HYDRO VERTICAL GENERATORS

HYDRO HORIZONTAL GENERATORS

© 2012 Ercole Marelli All rights reserved